Hall CD03 will be equipped with 1,090 panels with a total capacity of 533 kWp, while hall DC05 will be fitted with 694 panels totaling 340 kWp. The total installed capacity will thus reach 873 kWp.
The project is designed to maximize roof space utilization and optimize self-consumption of energy in both buildings.
The photovoltaic power plant will significantly reduce the operating costs of the facility and strengthen the energy self-sufficiency of both halls.