Combining Old and New Halls into a Single Energy Solution

The project carried out at the OH1 facility combines two parts – the original hall SO 01 and the newly built hall SO 02.

On the roof of the older hall SO 01, we installed ballast structures, DC trays, and cabling. About two-thirds of the roof is already covered with photovoltaic panels.

On the new hall SO 02, the ballast structures and DC trays are fully installed. DC cabling is being laid, followed by the installation of photovoltaic modules.

The entire project is designed to integrate both parts of the hall into a single PV system with optimized output and efficient roof space utilization

The installation is carried out with minimal disruption to the operation of the facility and with preparation for smooth connection to the distribution network.